Hired-hand Mega Flow SlantWall Fans: Power Cord Installation Manual do Utilizador

Consulte online ou descarregue Manual do Utilizador para Ventiladores Hired-hand Mega Flow SlantWall Fans: Power Cord Installation. Hired-Hand Mega Flow SlantWall Fans: Power Cord Installation User Manual [en] [es] [fr] Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 2
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 0
HIRED-HAND MFG., INC. 1733 Co Rd 68 Bremen, Alabama 35033 Phone 256-287-1000 Fax 265-287-2000
Manual Part Number 4802-5096 rev 9-04 Page 1
Ground Clip
WEG 3017-3080
WARNING
Disconnect all Electrical Power before installing the Power Cord.
Instructions
1. Turn off all power to the fan.
2. Locate the motor Junction Box and remove the cover.
3. Connect the motor wires as indicated in the diagrams below.
4. Connect power and test the motor and rotation direction.
5. Installation Complete.
Power Cord Wiring for 48 and 52 inch MegaFlow Fans with WEG Motor 3017-3080
!
To Ground Clip
To Motor
3 Conductor
Power Cord
L1 - Black
8 Red
L2 - White
5 Black
Green
1 Blue
7 P/2
4 Yellow
3 Orange
2 White
WEG 240 VAC Old Version
Tie and
Insulate
NOTE: To reverse motor direction, interchange 5 (Black) and 8 (Red) leads
To Motor
3 Conductor
Power Cord
WEG 240 VAC
L1 - Black
L2 - White
5 Black
Green
1 Blue
4 Yellow
8 Red
To Ground Clip
MegaFlow Power Cord Installation
Vista de página 0
1 2

Resumo do Conteúdo

Página 1 - Installation

HIRED-HAND MFG., INC. • 1733 Co Rd 68 • Bremen, Alabama 35033 • Phone 256-287-1000 • Fax 265-287-2000 Manual Part Number 4802-5096 rev 9-04

Página 2

HIRED-HAND MFG., INC. • 1733 Co Rd 68 • Bremen, Alabama 35033 • Phone 256-287-1000 • Fax 265-287-2000 Manual Part Number 4802-5096 rev 9-04

Comentários a estes Manuais

Sem comentários